info@sryengineering.com  ·  +91 98485 78660
Hyderabad & Visakhapatnam — Mon–Sat, 9:00–18:30

Welding

Structural & Pressure-Grade Joining

Welding

Our welding bay covers MIG, TIG and shielded metal arc welding (SMAW) for structural fabrication, pressure-part assembly and field repair — each joint finished and visually inspected before sign-off.

TIG welding handles thin-section and stainless work where finish and control matter most; MIG covers structural steel fabrication at production pace; arc welding handles heavier sections and site repair work.

For pressure parts — reactors, vessels, piping — welds are inspected and, where specified, hydrostatically tested before dispatch.

  • 01 MIG, TIG and SMAW / arc processes
  • 02 Structural steel and stainless fabrication
  • 03 Pressure-vessel and piping welds
  • 04 Visual and dimensional weld inspection
Request a Quote
// Process Spec — WELDING
Processes MIG · TIG · SMAW
Material thickness 1.5 – 40 mm
Materials MS, SS 304/316, alloy steel
Typical lead time 2–10 working days
Related Services

You Might Also Need

Reactor Fabrication

View Service →

Roll Manufacturing

View Service →

Conventional Turning

View Service →

Ready to Start a Job?

Share your drawing, quantity and target date — we'll come back with a quote.

Get a Quote